The Iowa Department of Transportation used controlled explosives Sunday to remove the remaining parts of the old I-74 bridge, which connects Iowa and Illinois over the Mississippi River.
Certain areas were temporarily closed, including the new bridge, during the removal of suspension cables and towers on the old bridge, the Iowa DOT said on its website.
“The main navigation channel in the river will be closed to all river traffic for up to 24 hours,” the Iowa DOT said.
In June, the Iowa DOT removed parts of the old I-74 bridge in the first phase of the demolition. The new bridge was built because of “increased traffic volume” the Iowa DOT said.
The westbound bridge, Illinois to Iowa, opened in 1935. The eastbound bridge, Iowa to Illinois, opened in 1960.
The new bridge was built in July 2017 and was fully opened in December 2021.
The project cost about $1 billion in total, including engineering, design and construction costs.
2025-04-19 21:492264 view
2025-04-19 21:462138 view
2025-04-19 21:35652 view
2025-04-19 21:081017 view
2025-04-19 20:342372 view
2025-04-19 19:36288 view
NEW ORLEANS (AP) — The state’s highest court has voted to temporarily remove a Baton Rouge judge fro
HARRISBURG, Pa. (AP) — Philadelphia voters on Tuesday will fill two vacant state House seats in spec
PHOENIX (AP) — Members of an Arizona tribe are trying to persuade a federal judge to extend a tempor